Al-Hadbaa Cement Plant (Old Hammam Al-Alil Cement Plant)
The plant was established by FCB (French company) in 1956. The work was completed in 1960, production began in 1963, the design capacity of the first production line is 350 tons/day of Portland cement to cover the need of the local market at that time, as well as the production of salt-resistant cement later to support plans for the construction of the Mosul dam north of the city and then support the maintenance of the dam.

The second line was established by the same company in 1974. The design capacity of the second production line is 375 tons/day .

The plant is now supply the local markets with various types of salt-resistant cement .

1. Ultra-soft and fast-hardening low-Alkaline cement for maintenance and stuffing in the Mosul Dam project.
2. Type (B) resistant to salt and sulfates cement, for oil well stuffing, for oil well drilling company.
3. Type (G) resistant to salts and sulfates cement, for deep oil well stuffing, for the oil well drilling company .
4. Type (V) resistant to salts and sulfates cement, for sewage channels and irrigation projects .
5. Resistant to salts and sulfates Cement is standard for local markets .

Lime Plant was established in the same area in 1978, which contains two production lines, design capacity for each line (100 tons/h), to Supply the production for local markets that was used to produce limestone bricks, paint and other industries, and the plant is now out of work, needing a rehabilitation process.
مـعـمـل سـمـنـت الـحـدبـاء الخط الانتاجي الاول :-

تم أنشاء المصنع من قبل شركة ( FCB ) الفرنسية في عام 1956 واكتمل العـمل في عام 1960 وبدأ الانتاج عام 1963 ـــ الطاقة التصميمية للخط الانتاجي الاول ( 350 ) طن / يوم من الاسمنت البروتلاندي العادي . ويهدف المشروع الى تغطية حاجة السوق المحلية في ذلك الوقت وكذلك انتاج الاسمنت المقاوم للاملاح فيما بعد لدعم بناء سد الموصل شمال المدينة .

الخط الانتاجي الثاني :-

تم أنشاء الخط الثاني من قبل نفس الشركة عام 1974 وكانت الطاقة التصميمية له ( 375 ) طن / يوم أنواع الاسمنت المنتج في المعـمل : -

يقوم المصنع حاليا بتزويد الاسواق المحلية بأنواع مختلفة من الاسمنت المقاوم للاملاح وكذلك مشروع سد الموصل وكما يلي: أولا : أسمنت فائق النعومة وسريع التصلب منخفض القلويات للصيانة والتحشية لمشروع سد الموصل ثانيا : أسمنت مقاوم للاملاح والكبريتات لتبطين ابار النفط لشركة حفر ابار النفط نوع B للشركات العاملة في العراق ثالثا : أسمنت نوع G مقاوم للاملاح والكبريتات لتبطين ابار النفط العميقة لشركة حفـر ابار النفط رابعا : أسمنت من نوع V مقاوم للاملاح والكبريتات لقنوات الصرف الصحي ومشاريع الري خامسا : الاسمنت المقاوم للاملاح والكبريتات نوع SRC للمشاريع المختلفة معـمـل الــنــورة :-

تم أنشاء معـمل النورة في نفس المنطقة عام 1978 والذي يحتوي على خطين انتاجيين بطاقة تصميمية 100 طن/ يوم لكل خط انتاجي ( النورة الحية Cao ) كمادة اساسية لانتاج الطابوق الجيري والاصباغ والثرمستون وغيرها من الصناعات والمعـمل متوقف حاليا عن العمل ويحتاج الى اعادة تأهيل . =
Group Factories

New Hammam Al-Alil Cement Plant Fallujah White Cement Plant Al-Hadbaa Cement Plant


Al-Hadbaa Cement Plant (Old Hammam Al-Alil Cement Plant)

Partner Teknik © 2020



Al-Hadbaa Cement Plant (Old Hammam Al-Alil Cement Plant)
The plant was established by FCB (French company) in 1956. The work was completed in 1960, production began in 1963, the design capacity of the first production line is 350 tons/day of Portland cement to cover the need of the local market at that time, as well as the production of salt-resistant cement later to support plans for the construction of the Mosul dam north of the city and then support the maintenance of the dam.

The second line was established by the same company in 1974. The design capacity of the second production line is 375 tons/day .

The plant is now supply the local markets with various types of salt-resistant cement .

1. Ultra-soft and fast-hardening low-Alkaline cement for maintenance and stuffing in the Mosul Dam project.
2. Type (B) resistant to salt and sulfates cement, for oil well stuffing, for oil well drilling company.
3. Type (G) resistant to salts and sulfates cement, for deep oil well stuffing, for the oil well drilling company .
4. Type (V) resistant to salts and sulfates cement, for sewage channels and irrigation projects .
5. Resistant to salts and sulfates Cement is standard for local markets .

Lime Plant was established in the same area in 1978, which contains two production lines, design capacity for each line (100 tons/h), to Supply the production for local markets that was used to produce limestone bricks, paint and other industries, and the plant is now out of work, needing a rehabilitation process.



مـعـمـل سـمـنـت الـحـدبـاء الخط الانتاجي الاول :-

تم أنشاء المصنع من قبل شركة ( FCB ) الفرنسية في عام 1956 واكتمل العـمل في عام 1960 وبدأ الانتاج عام 1963 ـــ الطاقة التصميمية للخط الانتاجي الاول ( 350 ) طن / يوم من الاسمنت البروتلاندي العادي . ويهدف المشروع الى تغطية حاجة السوق المحلية في ذلك الوقت وكذلك انتاج الاسمنت المقاوم للاملاح فيما بعد لدعم بناء سد الموصل شمال المدينة .

الخط الانتاجي الثاني :-

تم أنشاء الخط الثاني من قبل نفس الشركة عام 1974 وكانت الطاقة التصميمية له ( 375 ) طن / يوم أنواع الاسمنت المنتج في المعـمل : -

يقوم المصنع حاليا بتزويد الاسواق المحلية بأنواع مختلفة من الاسمنت المقاوم للاملاح وكذلك مشروع سد الموصل وكما يلي: أولا : أسمنت فائق النعومة وسريع التصلب منخفض القلويات للصيانة والتحشية لمشروع سد الموصل ثانيا : أسمنت مقاوم للاملاح والكبريتات لتبطين ابار النفط لشركة حفر ابار النفط نوع B للشركات العاملة في العراق ثالثا : أسمنت نوع G مقاوم للاملاح والكبريتات لتبطين ابار النفط العميقة لشركة حفـر ابار النفط رابعا : أسمنت من نوع V مقاوم للاملاح والكبريتات لقنوات الصرف الصحي ومشاريع الري خامسا : الاسمنت المقاوم للاملاح والكبريتات نوع SRC للمشاريع المختلفة معـمـل الــنــورة :-

تم أنشاء معـمل النورة في نفس المنطقة عام 1978 والذي يحتوي على خطين انتاجيين بطاقة تصميمية 100 طن/ يوم لكل خط انتاجي ( النورة الحية Cao ) كمادة اساسية لانتاج الطابوق الجيري والاصباغ والثرمستون وغيرها من الصناعات والمعـمل متوقف حاليا عن العمل ويحتاج الى اعادة تأهيل . =

Group Factories

New Hammam Al-Alil Cement Plant

Fallujah White Cement Plant

Al-Hadbaa Cement Plant


Al-Hadbaa Cement Plant (Old Hammam Al-Alil Cement Plant)

Partner Teknik © 2020